  • Temporary road sign U26 “End of temporary contraflow”, to SR 1848-1:2024.
  • 65x85 cm yellow panel with the lane returning to the right, in 1 mm galvanised steel sheet.
  • Class I (RA1) retroreflective sheeting, 7-year service life.
  • Fixings included: 2 clamps for Ø48 mm posts and 4 bolts with nuts.
285,00 lei VAT included

General features

SR 1848-1 code U26
Name in the standard End of temporary contraflow
Type Temporary road sign
Shape and colours 65x85 cm yellow panel with the lane returning to the right, onto its own carriageway
Size 65x85 cm
Material Galvanised steel sheet, 1 mm
Construction Rounded corners, pressed edges, no sharp edges
Painting Electrostatic
Retroreflective sheeting Class I (RA1)
Retroreflection (white, 0.2°/5°) 70 cd/(lx·m²)
Sheeting service life 7 years (SR 1848-2)
Fixings included 2 clamps, 4 bolts with nuts
Post diameter Ø48 mm (Ø60 mm on request)
Standards SR EN 12899-1:2007, SR 1848-1:2024, SR 1848-2:2011, SR 1848-3:2011
Weight 5 kg
Length 65 cm
Height 85 cm

Product description

U26 Temporary Sign – End of Temporary Contraflow (Right), 65x85 cm, Class I

The 65x85 cm yellow panel that ends the contraflow and shows the lane returning to its own carriageway, with class I retroreflective sheeting.

When class I is used

The class I version is the economical choice for work sites on local roads: RA1 retroreflective sheeting with a 7-year service life. The SR 1848-2 rule is simple: a temporary sign must have at least the class of the existing signing on the section, and areas with many light sources call for prismatic class 2 or 3 sheeting.

Where it goes, under SR 1848-1:2024

It goes at the end of the temporary contraflow, to show traffic returning to its normal carriageway. SR 1848-1:2024 sets no specific distance for this sign: it is installed under the technical regulations in force for signing roadworks, following the signing layout of the works. Like any sign, it normally goes on the right-hand side of the direction of travel, so that it can be seen from at least 50 m in built-up areas and at least 100 m outside them (SR 1848-2).

What the roadworks rules require (Order 1112/411/2000)

The sign belongs to the end-of-restriction signing: it goes after the end of the section occupied by the works, last in the installation order (after the advance signing and the signing that marks the works), also with at least 50 cm of clear space outside the carriageway.

On public roads, works are signed under the methodological rules approved by Order MI/MT no. 1112/411/2000. The road closure or traffic restriction is approved by the road authority, with the traffic police's agreement, on the basis of a signing layout endorsed as final, a copy of which the contractor keeps at the work site. The contractor installs, completes and maintains the signing for the whole job, removes it at the end and restores the original signing; accidents caused by incomplete or missing temporary signing are entirely the contractor's responsibility.

At night, if the existing signing on the road is retroreflective, the temporary signing must be retroreflective too and can be supplemented with flashing or sequential (“cascade”) amber lamps; on main and connecting streets in towns, retroreflective temporary signs are supplemented with flashing amber lamps.

Technical data
  • 65x85 cm yellow panel with the lane returning to the right, onto its own carriageway;
  • 1 mm galvanised steel sheet, with rounded corners and pressed edges, no sharp edges;
  • electrostatically painted;
  • class I retroreflective sheeting (RA1), with a 7-year service life;
  • fixings included: 2 clamps for Ø48 mm posts and 4 bolts with nuts;
  • compliant with SR EN 12899-1:2007, SR 1848-1:2024, SR 1848-2:2011 and SR 1848-3:2011.
Mounting and size

Fixings for the post are included: 2 clamps for Ø48 mm posts and 4 bolts with nuts; clamps for Ø60 mm posts are available on request. The bottom edge of the sign goes 1.50–2.50 m above the road or kerb, and the edge nearest the road 0.50–2.0 m from the road platform.

The 65x85 cm size is the one SR 1848-2 sets for county and local roads and streets; national roads call for 80x120 cm, and motorways for 120x180 cm.

? Frequently asked questions

Where does it go?

It goes at the end of the temporary contraflow, to show traffic returning to its normal carriageway. SR 1848-1:2024 sets no specific distance for this sign: it is installed under the technical regulations in force for signing roadworks, following the signing layout of the works. Like any sign, it normally goes on the right-hand side of the direction of travel, so that it can be seen from at least 50 m in built-up areas and at least 100 m outside them (SR 1848-2).

When is it installed?

Last, after the advance signing and the signing that marks the works, just after the end of the section occupied by the works, with at least 50 cm of clear space outside the carriageway. When the works finish, all the temporary signing is removed and the original signing is restored.

When can class I sheeting be used for roadworks?

Where the permanent signing on the section is class I too and there are few light sources. SR 1848-2 requires temporary signs to have at least the class of the existing signing, and in areas with street lighting, shop windows or advertising it requires prismatic class 2 or 3 sheeting.

Which fixings come with it?

The pack holds 2 clamps for Ø48 mm posts and 4 bolts with nuts. Clamps for Ø60 mm posts are available on request.

Who is responsible for the work-zone signing?

The contractor. Under Order MI/MT no. 1112/411/2000, the contractor installs the signing to the layout approved by the road authority with the traffic police's agreement, keeps a copy of the approval and the layout at the work site, maintains and completes the signing for the whole job and removes it at the end. Accidents caused by incomplete or missing temporary signing are entirely the contractor's responsibility.

Ordering and delivery

Can I order as a private individual?

Yes. You order directly on the site, as an individual or a company, and pay by card or cash on delivery.

Do I get an invoice?

Yes. Every order comes with a tax invoice, issued to an individual or a company.

Can I buy through SEAP / SICAP?

Yes. Public institutions find us in SICAP as S.C. ATTO REGAL S.R.L. Our company details are on the Purchase through SEAP / SICAP page.

How long does delivery take?

We deliver by courier within 24-48 hours.

Can I return the product?

Yes. As a private individual you can return the product within 14 days of receiving it, as the law provides, and you get your money back within 14 days of telling us. Return shipping is paid by the customer. The full terms are on the Return policy page.

Other similar models

SINCE 1998
Trusted partner

In road safety since 1998

Atto Trafic supplies complete road signage and safety equipment — signs, traffic signs, markings, parking barriers, speed bumps, mirrors, bollards and accessories.

  • Durable products, compliant with STAS and SR EN
  • ISO 9001 / 14001 / 27001 / 20671 certified
  • Constant stock, delivery within 24-48 hours
  • Support for municipalities, contractors, private car parks
See the certifications
Products in stock Delivery within 24-48 hours Custom offers
Cart
Your cart is empty.
Legal guarantee of conformity

The official European Union notice on the legal guarantee of conformity for goods bought by consumers. It explains the rights the law gives you; it is not an additional guarantee offered by ATTO TRAFIC.

Official EU notice “Legal guarantee”: minimum two-year legal guarantee protection for goods sold in the European Union. The full text is available below.
Text of the notice

Legal guarantee

Minimum two-year legal guarantee protection for goods sold in the European Union.

Consumers can claim their rights under the legal guarantee of conformity, for example if goods:

  • do not match the description;
  • do not function as intended.

Sellers are liable for any lack of conformity which existed when the goods were delivered, and which becomes apparent within the legal guarantee period. Sellers in such a situation are required to offer:

  • free repair or free replacement;
  • in some cases, a price reduction or full reimbursement.

Some countries have a longer legal guarantee period. For second-hand goods, a shorter period may apply, but not less than one year.

For more information on your rights in a specific country, scan the QR code below or ask the seller. europa.eu/youreurope/guarantees

What to do if you receive non-conforming goods:

  1. Contact the seller as soon as possible to report the issue;
  2. Provide proof of purchase, such as a receipt, invoice, or bank statement.

Sellers and producers may also offer commercial guarantees, which apply independently from the legal guarantee. For example, you may see this GARAN label representing a commercial guarantee of durability offered by the producer at no additional cost and covering the entire good.

Notificarea în limba română (Garanția legală)