Two-Component Cold-Applied Road Marking Paint, Green (RAL 6024), 20 kg
- Two-component MMA cold plastic, traffic green RAL 6024.
- For cycle lanes and heavy-traffic markings.
- 20 kg, covers 10-13 m² (1.5-2 kg/m²).
- Solvent-free, UV-resistant pigments.
Delivery within 24-48 hours
General features
| Type | Two-component cold plastic (MMA), solvent-free |
|---|---|
| Colour | Green (RAL 6024) |
| Weight | 20 kg |
| Use | Cycle lanes and heavy-traffic road markings |
| Binder | Methacrylic resin |
| Pigment | UV-resistant pigments |
| Density | 1.8 ± 0.10 kg/l |
| Viscosity | 110 ± 5 KU at 25 °C |
| Solid content | 99% ± 1% |
| Flash point | 21 °C |
| Theoretical coverage | 1.5-2 kg/m² |
| Curing at +5 °C | 2% catalyst; pot life 20 min; curing 55 min |
| Curing at +10 °C | 1% catalyst; pot life 12 min; curing 40 min |
| Curing at +20 °C | 1% catalyst; pot life 8 min; curing 30 min |
| Curing at +30 °C | 1% catalyst; pot life 6 min; curing 20 min |
| Thinning | Do not thin |
| Application | By hand, with a rubber roller, on an area marked out with tape |
| Application conditions | Surface between +5 and +30 °C; temperature ≥ 5 °C above dew point |
| UV ageing | UV1 |
| Retroreflection and skid resistance | Post-spray glass beads for immediate retroreflection and anti-skid material for skid resistance |
| Compatibility | Not applied over other paints, thermoplastic or marking tapes |
| New asphalt | Wait 4-6 weeks before applying |
| Tool cleaning | With road marking thinner; disposable rollers are recommended |
| Volatile organic compounds | 0 (Directive 2010/75/EU) |
| Hazard classification | Danger: H225, H319, H315, H335, H317; professional product |
| Shelf life | 24 months in the original sealed container, at +5 to +30 °C |
Product description
Two-component cold-applied road marking paint, green, RAL 6024, 20 kg
Traffic green RAL 6024 is the colour used for cycle lanes. But a cycle lane is not used only by bikes: cars cross it at junctions, driveways and car park entrances, and there a thin paint wears through in a few months. The ATP 2K-6024 is a two-component cold plastic based on methacrylic resin (MMA). It goes on as a thick coat with a roller and is made to last, even under heavy traffic.
How much lane per pail
Consumption is 1.5-2 kg/m², so the 20 kg covers 10-13 m². On a 1 m wide lane, that is 10-13 m of fully painted lane. For shorter stretches or repairs, the same paint comes in a 10 kg pail, the ATP 2K-6024/10.
How it goes onto the lane
Tape off the area. Stir the product with a mechanical stirrer, add the catalyst, 2% at +5 °C or 1% between +10 and +30 °C, and stir for at least another minute. Pour the material and spread it evenly with a rubber roller without breaking the film; the manufacturer recommends disposable rollers. Remove the tape before it fully cures. At +20 °C you have 8 minutes of working time, and the lane can reopen after about 30 minutes.
Surface preparation
The asphalt must be dry and clean, free from dust, oil, fuel, de-icing salt and old marking that no longer adheres. Do not apply it over other paints, thermoplastic or tapes. On new asphalt, wait 4-6 weeks. The surface must be between +5 and +30 °C, at least 5 °C above the dew point.
Grip and visibility
For grip under braking, drop anti-skid material onto the fresh coat. For night visibility, ATP AC90 glass beads, and for both, a mix of the two.
Technical data
- solvent-free, zero VOC, 99% solids;
- density 1.8 kg/l, viscosity 110 KU at 25 °C;
- 24-month shelf life in the sealed pail, at +5 to +30 °C;
- flammable, flash point 21 °C: work with gloves and safety glasses.
Other lane colours
Red, for the stretches you want to highlight: the ATP 2K-3020. White, with premixed beads, for symbols and lines: the ATP 2K-9016.
? Frequently asked questions
Why cold plastic rather than ordinary paint on a cycle lane?
Cars cross the lane at junctions, driveways and car park entrances, and there a thin paint wears through in a few months. The ATP 2K-6024 goes on as a thick coat with a roller and is made to last, even under heavy traffic.
How many metres of lane do I get from a pail?
Consumption is 1.5-2 kg/m², so the 20 kg covers 10-13 m², or 10-13 m of a fully painted 1 m wide lane.
When can the lane reopen?
At +20 °C you have 8 minutes of working time after adding the catalyst, and the lane can reopen after about 30 minutes.
What must be removed from the asphalt first?
Dust, oil, fuel, de-icing salt and old marking that no longer adheres. It is not applied over other paints, thermoplastic or tapes.
How do I get grip under braking and night visibility?
For grip, drop anti-skid material onto the fresh coat; for night visibility, ATP AC90 glass beads; for both, a mix of the two.
What other colours can I use on the lane?
Red, for the stretches you want to highlight: the ATP 2K-3020. White, with premixed beads, for symbols and lines: the ATP 2K-9016.
Ordering and delivery
Can I order as a private individual?
Yes. You order directly on the site, as an individual or a company, and pay by card or cash on delivery.
Do I get an invoice?
Yes. Every order comes with a tax invoice, issued to an individual or a company.
Can I buy through SEAP / SICAP?
Yes. Public institutions find us in SICAP as S.C. ATTO REGAL S.R.L. Our company details are on the Purchase through SEAP / SICAP page.
How long does delivery take?
We deliver by courier within 24-48 hours.
Can I return the product?
Yes. As a private individual you can return the product within 14 days of receiving it, as the law provides, and you get your money back within 14 days of telling us. Return shipping is paid by the customer. The full terms are on the Return policy page.
Other similar models
Get a personalised offer, transport included.
Sending this form is not an order.
We will send you the offer, transport included, as soon as possible by email or phone.