| Set contents | 2 mobile traffic lights, each with its own control unit |
|---|---|
| Lights | 3 x LED D-200 mm (red, yellow, green) |
| Light intensity | automatic, by ambient light |
| Synchronisation | manual, cable-free (internal clock, START pressed on both units together) |
| Distance between lights | depends on the travel time through the section |
| Adjustable times | all-red, green phase 1, green phase 2 |
| Time range | 1-99 s (5-495 s in x5 mode) |
| Modes | alternating cycle, flashing yellow |
| Alarms | failed lamps, low battery, fuse |
| Power supply | 12 V battery or 12 V power pack (not included) |
| Max. signal head power | 32 W at 12 V |
| Autonomy | approx. 150 h (new 100 Ah battery, 20 °C) |
| Weight | 46 kg per light, 92 kg the set |
| Length | 80 cm (box of one light) |
| Width | 50 cm (box of one light) |
| Height | 180-235 cm in use (adjustable, folding pole); box 70 cm |
| Transport | wheeled trolley with handle |
| Operating temperature | -20…+70 °C |
| Compliance | CE, Directive 2004/108/EC (electromagnetic compatibility) |
| Trolley colour | Yellow RAL 1023 |
When roadworks narrow a road to a single lane, the two directions have to take turns. The V11 set does this automatically: two mobile traffic lights, one at each end of the section, give green to each direction in turn. Under SR 1848-1:2024, the mobile traffic light is placed on a narrowed road section to direct the two directions of traffic alternately.
Two complete traffic lights. Each has a yellow RAL 1023 wheeled trolley that holds the battery, with a cover that opens to 180°, a support foot and a handle, a pole carrying the signal head with 3 Ø200 mm LED lights (red, yellow, green), and its own control unit.
There is no cable between the two lights: each control unit keeps time with an internal clock. You bring the lights side by side, set the same times on both, press START on the two units at the same moment, and only then take them to the ends of the section. Because they are not linked, the distance between the lights depends only on how long vehicles take to drive through the section. The lights must be synchronised again at least every 6 days, and while they run, staff must be present in the work zone.
On the control unit you set three times: red in both directions, so the section can clear, green for phase 1 and green for phase 2. Each runs from 1 to 99 seconds, or from 5 to 495 seconds in x5 mode. From the factory, all are 10 seconds. One button switches the light to flashing yellow and back to the normal cycle.
The unit constantly checks the lamps and the battery and shows a code when a light has failed, when the battery is running low or when the fuse has blown. If there is a safety problem, for example the red light fails, the traffic light switches itself to flashing yellow until it is fixed.
Each traffic light runs on a 12 V battery or a 12 V power pack; the batteries are not included. With a new 100 Ah battery, the tested autonomy is about 150 hours at 20 °C. The light intensity adjusts automatically to the ambient light, so the signal stays clearly visible at night. The battery can be changed at any time without losing the synchronisation.
The pole folds over the trolley, and the light is wheeled away by its handle. Each traffic light weighs 46 kg, so the set weighs 92 kg, and the trolley box of one light measures 70 x 80 x 50 cm (height x length x width). Opened, the light’s height adjusts between 180 and 235 cm. It works from -20 to +70 °C.
For maintenance there is the V11-CONTROL control unit, the Ø200 mm LED lights V11-D200-R, V11-D200-Y and V11-D200-G, and the complete V11-SUPORT signal head. The version with a countdown is the V11-21.
SR 1848-1:2024 provides the portable traffic light (V11) for a narrowed road section, to alternate the two directions of traffic. The methodological rules approved by Order MI/MT no. 1112/411/2000 allow three systems for alternating traffic: priority signs, traffic marshals, or traffic lights for automatic control, supplemented with priority signs. The system is chosen by traffic volume and section length; alternating traffic cannot be organised on a work section longer than 1,200 m. The section is announced in advance with the U9 (Traffic lights) temporary sign or the U34 panel.
The contractor installs the signing to the layout approved by the road authority with the traffic police's agreement, maintains and completes it for the whole job and removes it at the end; accidents caused by incomplete or missing temporary signing are entirely the contractor's responsibility.
For works that narrow the road to a single lane: one light at each end of the section gives green to each direction in turn. Under SR 1848-1:2024, the mobile traffic light is placed on a narrowed road section to direct the two directions alternately.
Manually, with no cable between them. You bring the lights side by side, set the same times, press START on both units at the same moment and then take them to the ends of the section; the distance between them depends only on how long vehicles take to drive through. They are synchronised again at least every 6 days, with staff present in the work zone.
The red time in both directions, so the section can clear, and the green times for the two phases. Each runs from 1 to 99 seconds, or from 5 to 495 seconds in x5 mode. From the factory all are 10 seconds, and the times must be the same on both lights.
With a new 100 Ah battery, the tested autonomy is about 150 hours at 20 °C. Each light needs a 12 V battery or a 12 V power pack; the batteries are not included, and the unit's display warns you when one is running low.
The control unit shows a code for the faulty light. If it is the red light, the traffic light switches itself to flashing yellow until it is fixed. The lights are replaced separately: V11-D200-R, V11-D200-Y and V11-D200-G.
The pole folds over the trolley, and each light is wheeled away by its handle. One light weighs 46 kg and its box measures 70 x 80 x 50 cm; the set of two weighs 92 kg. Opened, its height adjusts between 180 and 235 cm.
The V11-20 has no countdown. On the V11-21, the middle light of each traffic light also shows a countdown, so waiting drivers can see when the change is coming.
The contractor. Under Order MI/MT no. 1112/411/2000, the contractor installs the signing to the layout approved by the road authority with the traffic police's agreement, keeps a copy of the approval and the layout at the work site, maintains and completes the signing for the whole job and removes it at the end. Accidents caused by incomplete or missing temporary signing are entirely the contractor's responsibility.
Yes. You order directly on the site, as an individual or a company, and pay by card or cash on delivery.
Yes. Every order comes with a tax invoice, issued to an individual or a company.
Yes. Public institutions find us in SICAP as S.C. ATTO REGAL S.R.L. Our company details are on the Purchase through SEAP / SICAP page.
We deliver by courier within 24-48 hours.
Yes. As a private individual you can return the product within 14 days of receiving it, as the law provides, and you get your money back within 14 days of telling us. Return shipping is paid by the customer. The full terms are on the Return policy page.
Get a personalised offer, transport included.
Sending this form is not an order.
We will send you the offer, transport included, as soon as possible by email or phone.
Atto Trafic supplies complete road signage and safety equipment — signs, traffic signs, markings, parking barriers, speed bumps, mirrors, bollards and accessories.