| Type | Two-component cold plastic (MMA), solvent-free |
|---|---|
| Colour | Green (RAL 6024) |
| Weight | 10 kg |
| Use | Cycle lanes and heavy-traffic road markings |
| Binder | Methacrylic resin |
| Pigment | UV-resistant pigments |
| Density | 1.8 ± 0.10 kg/l |
| Viscosity | 110 ± 5 KU at 25 °C |
| Solid content | 99% ± 1% |
| Flash point | 21 °C |
| Theoretical coverage | 1.5-2 kg/m² |
| Curing at +5 °C | 2% catalyst; pot life 20 min; curing 55 min |
| Curing at +10 °C | 1% catalyst; pot life 12 min; curing 40 min |
| Curing at +20 °C | 1% catalyst; pot life 8 min; curing 30 min |
| Curing at +30 °C | 1% catalyst; pot life 6 min; curing 20 min |
| Thinning | Do not thin |
| Application | By hand, with a rubber roller, on an area marked out with tape |
| Application conditions | Surface between +5 and +30 °C; temperature ≥ 5 °C above dew point |
| UV ageing | UV1 |
| Retroreflection and skid resistance | Post-spray glass beads for immediate retroreflection and anti-skid material for skid resistance |
| Compatibility | Not applied over other paints, thermoplastic or marking tapes |
| New asphalt | Wait 4-6 weeks before applying |
| Tool cleaning | With road marking thinner; disposable rollers are recommended |
| Volatile organic compounds | 0 (Directive 2010/75/EU) |
| Hazard classification | Danger: H225, H319, H315, H335, H317; professional product |
| Shelf life | 24 months in the original sealed container, at +5 to +30 °C |
Cycle lanes wear unevenly: the stretch at a junction or at a car park entrance, where cars also drive, wears much faster than the rest. For repairs like these, or for a short lane, the ATP 2K-6024/10 brings the same green RAL 6024 cold plastic as the 20 kg version in a 10 kg pail. Less material is left over, and the colour matches the rest of a lane painted with the same range.
At 1.5-2 kg/m², the pail covers 5-6.5 m², or 5-6.5 m of a 1 m wide lane.
The catalyst goes in once the product has been stirred: 2% at +5 °C and 1% at +10, +20 and +30 °C. Working time shortens as it gets warmer, from 20 minutes at +5 °C to 6 minutes at +30 °C, and curing takes between 55 and 20 minutes. Only mix as much as you can spread in that time, and prepare the area first.
On dry, clean asphalt, with any old marking that no longer adheres removed. It is not recommended over other paints, thermoplastic or tapes. On new asphalt, wait 4-6 weeks, and the surface must be between +5 and +30 °C.
Drop anti-skid material onto the fresh coat, and for retroreflection, ATP AC90 glass beads.
The same paint in a 20 kg pail, covering 10-13 m²: the ATP 2K-6024.
For repairs on worn stretches, such as at a junction or a car park entrance, or for a short lane. Less material is left over, and the colour is the same RAL 6024 green as the ATP 2K-6024.
At 1.5-2 kg/m², the pail covers 5-6.5 m², or 5-6.5 m of a 1 m wide lane.
Only as much as you can spread within the working time, which drops from 20 minutes at +5 °C to 6 minutes at +30 °C. Prepare the area before adding the catalyst.
The asphalt must be dry and clean, with any old marking that no longer adheres removed. On new asphalt, wait 4-6 weeks, and the surface must be between +5 and +30 °C.
With road marking thinner. Disposable rollers are recommended for spreading the material.
Yes. You order directly on the site, as an individual or a company, and pay by card or cash on delivery.
Yes. Every order comes with a tax invoice, issued to an individual or a company.
Yes. Public institutions find us in SICAP as S.C. ATTO REGAL S.R.L. Our company details are on the Purchase through SEAP / SICAP page.
We deliver by courier within 24-48 hours.
Yes. As a private individual you can return the product within 14 days of receiving it, as the law provides, and you get your money back within 14 days of telling us. Return shipping is paid by the customer. The full terms are on the Return policy page.
Get a personalised offer, transport included.
Sending this form is not an order.
We will send you the offer, transport included, as soon as possible by email or phone.
Atto Trafic supplies complete road signage and safety equipment — signs, traffic signs, markings, parking barriers, speed bumps, mirrors, bollards and accessories.